Another 30-year concession request has been submitted to one of the local authorities under the Italian Ministry of Infrastructure and Transport (MIT) for a floating wind farm in the Mediterranean Sea.
This is an excerpt from a Premium article published on our sister site Offshore Energy.
You can read the original article by clicking on the link below:
