offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Equinor-BP Venture Taps Jacobs to Design US Offshore Wind Terminal
Contracts & Tenders

March 31, 2022 · about 4 years ago

Equinor-BP Venture Taps Jacobs to Design US Offshore Wind Terminal

Empire Offshore Wind, a joint venture between Equinor and BP, has selected Jacobs for the detail design of New York’s South Brooklyn Marine Terminal (SBMT). Port upgrades to redevelop SBMT were part of the Empire Wind 2 and Beacon Wind 1 project proposals Equinor and BP submitted in the 2021 offshor

2 minutes read
  • LinkedIn
  • X
  • Email
Artistic rendering of concept for site development of the South Brooklyn Marine Terminal

Empire Offshore Wind, a joint venture between Equinor and BP, has selected Jacobs for the detail design of New York’s South Brooklyn Marine Terminal (SBMT).

Port upgrades to redevelop SBMT were part of the Empire Wind 2 and Beacon Wind 1 project proposals Equinor and BP submitted in the 2021 offshore wind power solicitation in the State of New York, which selected the two projects in January last year.

Located in Sunset Park, Brooklyn, the facility will serve as an operations and maintenance (O&M) base, as well as a staging and assembly port for wind turbine installation.

The architectural and engineering design services contract includes oversight for the modification of existing bulkheads to strengthen and accommodate heavy lift operations, upland site redevelopment and coordination with ongoing remediation efforts.

The company will also provide design services regarding dredging, a new green O&M facility, new docking facilities for crew transfer and service operation vessels, utility upgrades, as well as permitting and construction support.

A few weeks ago, the New York City Mayor, Eric Adams, announced that the engineering and design of the new SBMT are moving forward after an agreement was finalised between the New York City Economic Development Corporation (NYCEDC), Equinor, its partner BP, and Sustainable South Brooklyn Marine Terminal (SSBMT).

Related Article

Equinor, BP and New York City Launch South Brooklyn Marine Terminal Transformation

The city has committed to investing USD 57 million to support the transformation of SBMT, with construction works expected to begin in the second half of 2023.

“Following our recently announced agreement to transform the South Brooklyn Marine Terminal, Equinor and bp are moving forward with this next step in realizing our offshore wind hub vision ,” said Teddy Muhlfelder , acting Vice President Empire Wind and Beacon Wind, Equinor Renewables US.

“The contract award will bring direct jobs to the local community, leaning on Jacobs’ expertise to advance these vital port facilities to support Empire Wind, Beacon Wind and the wider offshore wind industry .”

Follow offshoreWIND.biz on:

Related Articles

Authorities

Equinor and BP Win Big Offshore New York

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago