offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Turbine Stands at Subsidy-Free Hollandse Kust Zuid Offshore Wind Farm
Business & Finance

April 19, 2022 · about 4 years ago

First Turbine Stands at Subsidy-Free Hollandse Kust Zuid Offshore Wind Farm

The first of the 140 Siemens Gamesa 11.0-200 DD wind turbines has been installed on the 1.5 GW Hollandse Kust Zuid – the world’s first subsidy-free offshore wind farm. This is also the first SG 11.0-200 DD unit to be installed offshore and the largest and most powerful wind turbine to be installed o

1 minutes read
  • LinkedIn
  • X
  • Email
First wind turbine at Hollandse Kust Zuid offshore wind farm in the Netherlands

The first of the 140 Siemens Gamesa 11.0-200 DD wind turbines has been installed on the 1.5 GW Hollandse Kust Zuid – the world’s first subsidy-free offshore wind farm.

This is also the first SG 11.0-200 DD unit to be installed offshore and the largest and most powerful wind turbine to be installed on an offshore wind farm.

Once all of the 140 wind turbines are installed and commissioned in the summer of 2023, Hollandse Kust Zuid will also become the world’s largest offshore wind farm in operation.

The wind turbines are being transported from Sif’s facility at Maasvlakte 2 in the Port of Rotterdam and installed at the site some 20 kilometres off the Dutch province of Zuid-Holland by Cadeler’s wind turbine installation vessel – Wind Osprey .

Hollandse Kust Zuid is owned by Vattenfall, BASF , and Allianz . Vattenfall, who is leading the development of the project, said that the first power from the wind farm is expected in early May.

Follow offshoreWIND.biz on:

Related Articles

Business & Finance

First Subsidy-Free Offshore Wind Farm Reaches Turbine Installation Phase

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceEnvironmentGrid ConnectionVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago