offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Heerema to Install XL Foundations at He Dreiht Offshore Wind Farm
Contracts & Tenders

April 25, 2022 · about 4 years ago

Heerema to Install XL Foundations at He Dreiht Offshore Wind Farm

EnBW has awarded Heerema Marine Contractors with the contract to transport and install the turbine foundations at the 900 MW He Dreiht offshore wind farm in the German North Sea. The work includes the transport and installation of 64 monopiles and transition pieces. During operations, Heerema will u

2 minutes read
  • LinkedIn
  • X
  • Email
Heerema to Install XL Foundations at He Dreiht Offshore Wind Farm

EnBW has awarded Heerema Marine Contractors with the contract to transport and install the turbine foundations at the 900 MW He Dreiht offshore wind farm in the German North Sea.

The work includes the transport and installation of 64 monopiles and transition pieces.

During operations, Heerema will use the IHC IQIP double-walled noise mitigation system NMS-10,000 amongst other systems to reduce noise pollution, the company said.

”We are delighted to be EnBW’s chosen contractor, and we must credit the Heerema team and our client for their excellent collaboration in finding the most suited solutions for the He Dreiht project,” Heerema CEO, Koos-Jan van Brouwershaven said.

The monopile foundations will support Vestas’ flagship V236-15.0 MW wind turbines. He Dreiht will be the first project to feature this model, and the first wind farm to feature a turbine model with an individual capacity of 15 MW or more.

Heerema’s Offshore Wind Director, Jeroen van Oosten said: ”We are committed to increasing our market share in large monopile installations for offshore wind, and are proud to be chosen to enable EnBW to deliver 900 MW of renewable energy.”

Located 90 kilometers northwest of Borkum and about 110 kilometres west of Heligoland, the subsidy-free He Dreiht is scheduled to go into operation in 2025.

EnBW He Dreiht Project Director, Jörn Däinghaus said: ”Heerema is a contractor with a high level of experience and excellent technological know-how. We look forward to working with Heerema to develop and install our first subsidy-free offshore windpark.”

Follow offshoreWIND.biz on:

Related Articles

Contracts & Tenders

EnBW First to Select Vestas 15 MW Offshore Wind Turbine

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago