offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Van Oord Orders Study on Sofia Inter-Array Cable Stability
Business & Finance

May 9, 2022 · about 4 years ago

Van Oord Orders Study on Sofia Inter-Array Cable Stability

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK. The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water. According to P

1 minutes read
  • LinkedIn
  • X
  • Email
Van Oord Orders Study on Sofia Inter-Array Cable Stability

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK.

The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water.

According to Peritus, the detailed analysis work aims to increase the duration that the cables can be left on the seabed prior to trenching.

Van Oord is the EPCI contractor for the inter-array cables and monopile foundations for the Sofia offshore wind project under a contract won at the beginning of 2021.

The Dutch company earlier this year selected Hellenic Cables for the supply of 66 kV inter-array cables and accessories for the 1.4 GW project.

The export cable will be delivered by Prysmian.

Sofia will feature 100 SG 14-222 DD turbines scheduled to be fully commissioned in 2026. Offshore construction is expected to start in 2023.

Related Articles

Operations & Maintenance

Sofia Offshore Wind Farm Picks Q&I Services Provider

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersGrid ConnectionR&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago