offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ZTT Delivers Subsea Cable for 500 MW Wind Farm Offshore China
Business & Finance

June 6, 2022 · about 4 years ago

ZTT Delivers Subsea Cable for 500 MW Wind Farm Offshore China

ZTT Submarine Cable & System has completed the factory acceptance test and loaded out the subsea cable for the Shanwei Jiazi​-One offshore wind project in China. The Chinese company was in charge of delivering 66 kilometres of 220 kV subsea cable for CGN Engineering, with installation scheduled to b

1 minutes read
  • LinkedIn
  • X
  • Email
ZTT Delivers Subsea Cable for Local 500 MW Offshore Wind Project

ZTT Submarine Cable & System has completed the factory acceptance test and loaded out the subsea cable for the Shanwei Jiazi​-One offshore wind project in China.

The Chinese company was in charge of delivering 66 kilometres of 220 kV subsea cable for CGN Engineering, with installation scheduled to be completed by August.

Shanwei Jiazi​-One is located on the south side of Hudong Town, Shanwei City, Guangdong Province in water depths of between 30 and 35 metres. The closest distance to the land is about 25 kilometres.

The 500 MW project will comprise 78 6.45 MW turbines​ and will see the construction of a 220 kV offshore booster station, including the onshore booster station (centralized control center) shared by CGN’s Houhu, Jiazi​-​One, and Jiazi-​Two projects.

The power generated by the project will be boosted to 500 kV at the onshore booster station and then connected to the 500 kV Maohu station.

According to ZTT, Shanwei Jiazi​-One is the first offshore wind project approved to use the voltage level of 500 kV in China.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago