MingYang Smart Energy has produced its first MySE 12 MW hybrid drive offshore wind turbine at the Guangdong Shanwei manufacturing facility in China. The model has been designed to withstand super typhoons of 78.82 m/s.
MySE 12 MW, which is certified by the China General Certification Center (CGC) is an upgrade from the 11 MW platform that integrates a variety of innovative technologies for efficient and reliable performance, said MingYang Smart Energy.
