offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Survey Starting at Scottish Floating Offshore Wind Project
Business & Finance

July 8, 2022 · about 4 years ago

Survey Starting at Scottish Floating Offshore Wind Project

A geophysical and environmental survey is set to soon commence at the Salamander floating offshore wind project off the coast of Scotland in the North Sea. The geophysical survey and benthic drop-down video and grab survey activities are expected to commence on 26 July at the earliest and run until

1 minutes read
  • LinkedIn
  • X
  • Email
Survey Starting at Scottish Floating Offshore Wind Project

A geophysical and environmental survey is set to soon commence at the Salamander floating offshore wind project off the coast of Scotland in the North Sea.

The geophysical survey and benthic drop-down video and grab survey activities are expected to commence on 26 July at the earliest and run until 30 September at the latest, in case of weather delays or downtime.

The geophysical scope of work will be divided into three main areas, including the offshore wind farm array area, offshore section of the export cable route, and nearshore section of the export cable route.

Ocean Infinity will conduct the offshore geophysical survey using Northern Franklin, while SEP Hydrographic will carry out the nearshore geophysical survey using Mersey Discovery.

The geophysical survey will include multibeam echosounder (MBES), acoustic MBES backscatter (ABS), side-scan sonar (SSS), magnetometer (MAG), and high-frequency sub-bottom profiler (SBP) data.

Its aim is to also provide the necessary data to feed into the Environmental Impact Assessment (EIA) process.

The 100 MW Salamander project is being developed by Simply Blue Energy Scotland (SBES).

It is located approximately 35 kilometres east of Peterhead in the Northeast of Scotland, in an outline area of interest of approximately 67 square kilometres with water depths up to 115 metres.

Ørsted joined the joint venture behind the project and acquired a majority stake in April.

Follow offshoreWIND.biz on:

Related Articles

Business & Finance

Simply Blue Energy and Subsea 7 to Develop Floating Wind Project in Scotland

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago