offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Fugro to Work on New Irish Offshore Wind Projects
Business & Finance

July 21, 2022 · about 4 years ago

Fugro to Work on New Irish Offshore Wind Projects

Fugro is set to kick off a geotechnical site survey campaign at the North Celtic Sea and South Irish Sea offshore wind projects at the end of July. Supply vessel Fugro Voyager is in charge of carrying out the work which will include a downhole cone penetration test (CPT) and continuous sampling bore

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro to Work on New Irish Offshore Wind Projects

Fugro is set to kick off a geotechnical site survey campaign at the North Celtic Sea and South Irish Sea offshore wind projects at the end of July.

Supply vessel Fugro Voyager is in charge of carrying out the work which will include a downhole cone penetration test (CPT) and continuous sampling boreholes with geophysical logging.

Activities are expected to be carried out from 30 July until 30 September on a 24-hour basis, weather dependent.

The two offshore wind projects are being developed by Energia Group. The company decided back in 2019 to implement a EUR 3 billion investment program in Ireland’s renewable sector, which included the offshore wind market as well.

The 800 MW North Celtic Sea project will be located between 10 kilometres and 25 kilometres off the Waterford coast. Green Rebel carried out the geophysical surveys at the project earlier this year.

The South Irish Sea wind farm, currently at the early stage of the environmental assessment process, is planned to have a generation capacity of between 600 MW and 800 MW.

Ocean Infinity just recently started a geophysical survey campaign at the wind farm site located at a minimum of 10 kilometres and up to 25 kilometres off the coasts of Wexford and south Wicklow.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago