offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Fugro on Survey Duty at Vattenfall’s Offshore Wind Pair
Business & Finance

July 27, 2022 · about 4 years ago

Fugro on Survey Duty at Vattenfall’s Offshore Wind Pair

Fugro is set to soon commence a geophysical and geotechnical site survey at Vattenfall’s Norfolk offshore wind projects in the North Sea. Fugro Discovery will be deployed over the survey area starting on or around 1 August, with the activities set to be completed by the end of November. The 70-metre

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro on Survey Duty at Vattenfall's Offshore Wind Pair

Fugro is set to soon commence a geophysical and geotechnical site survey at Vattenfall’s Norfolk offshore wind projects in the North Sea.

Fugro Discovery will be deployed over the survey area starting on or around 1 August, with the activities set to be completed by the end of November.

The 70-metre long vessel will be conducting offshore geophysical survey activities using multibeam echosounder (MBES), sub-bottom profiler (SBP), towed side-scan sonar (SSS) and towed magnetometer (MAG).

Vattenfall’s proposed Norfolk Offshore Wind Zone is located 47 kilometres off the coast of Norfolk at its nearest point and includes the Norfolk Vanguard and Norfolk Boreas projects.

The wind farms will comprise between 180 and 312 turbines expected to deliver first power in mid-2020s.

The zone will produce enough power annually for the equivalent of 3.9 million UK homes, with Norfolk Vanguard and Norfolk Boreas providing up to 3.6 GW of renewable electricity capacity once operational.

Both projects have been approved by the UK Government. Construction is expected to start in 2023.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago