offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Saint-Nazaire Entering Home Stretch
Wind Farm Update

July 29, 2022 · about 4 years ago

Saint-Nazaire Entering Home Stretch

56 out of the 80 GE Haliade 150-6 MW wind turbines have been installed at the 480 MW Saint-Nazaire wind farm site offshore France with the first 25 per cent of the wind farm already commissioned by mid-July. Jane De Nul’s jack-up Vole au vent is transporting the wind turbines from the Nantes Saint-N

2 minutes read
  • LinkedIn
  • X
  • Email
Saint-Nazaire

56 out of the 80 GE Haliade 150-6 MW wind turbines have been installed at the 480 MW Saint-Nazaire wind farm site offshore France with the first 25 per cent of the wind farm already commissioned by mid-July.

Jane De Nul’s jack-up Vole au vent is transporting the wind turbines from the Nantes Saint-Nazaire port and installing them at the first commercial-scale offshore wind farm in France.

The first offshore wind turbine was installed at the site located between 12 and 20 kilometres off the coast of the Guérande peninsula in the first half of April. Last month, the wind farm delivered its first power to the French national grid.

Related Article

Power Flows from First French Commercial-Scale Offshore Wind Farm

The installation of the inter-array cables is also currently underway, with the Olympic Triton laying 70 of the 80 cables so far.

Back in 2018, Louis Dreyfus TravOcean (LDTVO) and Prysmian secured the contract for the supply and installation of inter-array cables.

Under the agreement, Prysmian was responsible for cable manufacturing, while LDTVO is responsible for transporting the cables to the Montoir-de-Bretagne logistics base, storing, and installing them between the wind turbines.

At the end of May, all 80 foundations were installed using DEME Offshore’s installation vessel Innovation .

The construction of the wind farm is scheduled to be completed in December 2022.

Saint-Nazaire, also known as Parc éolien en mer du Banc de Guérande, is owned and developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board.

Follow offshoreWIND.biz on:

Related Articles

Ports & Logistics

France’s First Offshore Wind Farm Halfway There

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago