offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Geophysical Surveys Starting at Irish 1 GW Floating Offshore Wind Project
Business & Finance

August 29, 2022 · about 3 years ago

Geophysical Surveys Starting at Irish 1 GW Floating Offshore Wind Project

A geophysical site survey campaign is set to begin in September at the proposed Inis Ealga Marine Energy Park floating offshore wind project in Ireland. DP Energy Ireland plans to kick off the geophysical surveys on 2 September at the site located off counties Cork and Waterford. The works will be c

1 minutes read
  • LinkedIn
  • X
  • Email
Thor Wind Turbine
Thor Wind Turbine

A geophysical site survey campaign is set to begin in September at the proposed Inis Ealga Marine Energy Park floating offshore wind project in Ireland.

DP Energy Ireland plans to kick off the geophysical surveys on 2 September at the site located off counties Cork and Waterford.

The works will be carried out by ILV Granuaile and are expected to take five days, weather dependent.

The reconnaissance geophysical survey will be undertaken by running widely spaced lines across the array investigation area.

The survey work will be performed using a hull-mounted multibeam echosounder (MBES) and towed seismic system with a maximum towed length of 60 metres.

The Inis Ealga Marine Energy Park is part of a 3 GW pipeline of offshore wind projects that DP Energy and Iberdrola are developing in Ireland after entering into a joint venture in 2021 .

The 1 GW floating wind project, currently in its early development stage, is expected to be fully commissioned by 2030.

The developers published a scoping report for the environmental impact assessment report (EIAR) for the project in mid-July. Consultation is open until 21 September.

Follow offshoreWIND.biz on:

Related Articles

Contracts & Tenders

Iberdrola and DP Energy Power Ahead with Large-Scale Irish Floater

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago