offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Damen Developing New Vessel Class for Floating Offshore Wind Market
R&D

September 20, 2022 · about 3 years ago

Damen Developing New Vessel Class for Floating Offshore Wind Market

Netherlands-headquartered Damen Shipyards has revealed it is developing a new vessel class that will be capable of supporting the growing floating offshore wind industry. Damen has cited forecasts which indicate that by 2050 over 200 GW or around 13,500 units of new floating offshore wind turbines w

2 minutes read
  • LinkedIn
  • X
  • Email
Damen Shipyards

Netherlands-headquartered Damen Shipyards has revealed it is developing a new vessel class that will be capable of supporting the growing floating offshore wind industry.

Damen has cited forecasts which indicate that by 2050 over 200 GW or around 13,500 units of new floating offshore wind turbines will be in operation, and given the size of the turbines and water depths in which they will be installed, these units will require chains and anchors of “unprecedented” sizes.

Research indicates that each wind turbine will need between three and six anchors, with chain diameters increasing from a typical 152 mm for a large offshore structure to upwards of 220 mm, the Dutch company said.

While the anchoring technologies will remain much the same, the vessels required to handle them will need to be much bigger than today’s anchor handling vessels, according to Damen.

In cooperation with suppliers and vessel operators, Damen is now working on a new class that will be able to meet this need.

Damen is also in discussion with other suppliers regarding new deck systems that could accelerate the loading of chains, synthetic rope, steel wire, clump weights, and other possible mooring line components.

“There are many variables relating to the new vessel concept still to be assessed and explored, not least the final nature of the FOWT mooring systems. If larger numbers of lighter anchors and chains per turbine are judged superior to fewer but larger, the vessel design will adapt accordingly”, said Wijtze van der Leij , Damen’s business development manager of offshore wind.

The company said its offshore construction facility in Mangalia, Romania, will also be playing a part in the floating offshore wind market development since it is well positioned and equipped to produce the large number of floating foundations on which the wind turbines will be mounted.

The new vessel will be the latest in a long line of boats designed and built by Damen for the offshore renewables sector. Recent additions include the service operations vessel (SOV) with walk-to-work capability and the new Fast Crew Supplier (FCS) 7011, Aqua Helix .

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago