offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›4.1 GW Scottish Offshore Wind Site Soon to Buzz with Activity
Business & Finance

September 29, 2022 · about 3 years ago

4.1 GW Scottish Offshore Wind Site Soon to Buzz with Activity

SSE Renewables is set to soon return to the 4.1 GW Berwick Bank Wind Farm located off the east coast of Scotland to commence further geotechnical survey work. Fugro is in charge of carrying out the work and will use the 83-metre long Fugro Scout. The survey is planned to mobilize between 7 and 10 [&

1 minutes read
  • LinkedIn
  • X
  • Email
4.1 GW Scottish Offshore Wind Site Soon to Buzz with Activity

SSE Renewables is set to soon return to the 4.1 GW Berwick Bank Wind Farm located off the east coast of Scotland to commence further geotechnical survey work.

Fugro is in charge of carrying out the work and will use the 83-metre long Fugro Scout.

The survey is planned to mobilize between 7 and 10 October and is expected to take approximately five months.

The scope of work within the main array area will include up to 35 composite rotary boreholes advanced as a combination of sampling in sand and clay and cone penetration testing (CPT) downhole pushes through suitable soils and then extended by rotary core drilling to depths up to 40 metres below the seabed.

The first phase of the geotechnical survey work was completed at the beginning of the year. The second phase kicked off in June.

Berwick Bank has been in development for ten years, initially as two projects: the 2.3 GW Berwick Bank and the 1.85 GW Marr Bank offshore wind farm.

Last year, SSE Renewables informed that it had combined the two offshore wind projects into one development.

Ofgem recently granted an electricity generation license for the project.

The 4.1 GW project is planned to be built in the outer Firth of Forth, over 40 kilometers from the East Lothian coast.

Follow offshoreWIND.biz on:

Related Articles

Authorities

Ofgem Grants Electricity Generation Licence to Berwick Bank

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago