offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Geophysical Survey Underway at 1 GW Irish Offshore Wind Farm Site
Wind Farm Update

September 30, 2022 · about 3 years ago

Geophysical Survey Underway at 1 GW Irish Offshore Wind Farm Site

A geophysical survey campaign has started at the project site of SSE Renewables’ Braymore Wind Park in the north Irish Sea. The campaign will involve the deployment of towed equipment from survey vessels and is expected to be completed by early November 2022, subject to weather and operational const

1 minutes read
  • LinkedIn
  • X
  • Email
Geophysical Survey Underway at 1 GW Irish Offshore Wind Farm Site

A geophysical survey campaign has started at the project site of SSE Renewables’ Braymore Wind Park in the north Irish Sea.

The campaign will involve the deployment of towed equipment from survey vessels and is expected to be completed by early November 2022, subject to weather and operational constraints.

The survey, being conducted by two survey vessel, will be confined to the proposed Braymore wind turbine array area to provide site investigation information to facilitate the development of the array.

The wind turbine array of the Braymore offshore wind farm is located approximately 18 kilometres from Dunany Point in County Louth at its most northerly point, and Braymore Point in County Dublin at its most southerly point.

Earlier this month, an unmanned surface vessel (USV) survey was also announced to begin this month at the Braymore Wind Park site, utilising remotely piloted XOcean USVs.

Braymore Wind Park will feature between 40 and 50 bottom-fixed turbines that will be able to generate up to 1 GW of renewable energy and power over 1 million homes annually.

Construction is expected to begin in 2027, with first electricity anticipated by 2030.

Follow offshoreWIND.biz on:

Related Articles

Business & Finance

USV Survey Starting at Proposed 1 GW Offshore Wind Project in Ireland

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago