offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Low Emission CTV Starts Servicing Equinor’s UK Offshore Wind Farms
Contracts & Tenders

October 21, 2022 · about 3 years ago

Low Emission CTV Starts Servicing Equinor’s UK Offshore Wind Farms

Norway-headquartered Equinor has chartered Seacat Columbia, a new BARTech 30 crew transfer vessel (CTV), from Seacat Services, for operations at its Sheringham Shoal and Dudgeon wind farms offshore Norfolk, England. The charter will cover service at the 317 MW Sheringham Shoal and the 402 MW Dudgeon

2 minutes read
  • LinkedIn
  • X
  • Email
Seacat Columbia

Norway-headquartered Equinor has chartered Seacat Columbia , a new BARTech 30 crew transfer vessel (CTV), from Seacat Services, for operations at its Sheringham Shoal and Dudgeon wind farms offshore Norfolk, England.

The charter will cover service at the 317 MW Sheringham Shoal and the 402 MW Dudgeon offshore wind farms, both operated by Equinor from its operations and maintenance hub in Great Yarmouth.

Equinor selected Seacat Columbia following a competitive tender due to its capability to reduce fuel use and carbon dioxide emissions, while increasing access to offshore wind farms in harsher sea states, Equinor said.

Seacat Columbia is a UK-designed, built, flagged, owned, and operated CTV, and the contract with Equinor sustained twelve UK jobs.

The vessel was designed by marine engineering consultancy BAR Technologies and was built at Diverse Marine Shipyard on the Isle of Wight.

With its multi-hull 30-metre ProA design and its patented Foil Optimised Stability System (FOSS), the vessel can cut carbon dioxide emissions by up to 1,200 tonnes a year when working on the 24-hour charter operation.

By minimising vessel motion, the CTV can see an average increase in stability across all sea states of up to 70 per cent over a typical operational profile, Equinor said.

This makes the vessel one of the first Low Emission Vehicles (LEVs) serving the UK’s growing fleet of offshore wind farms.

Equinor recently applied to the UK’s Planning Inspectorate for permission to build extensions to both the Sheringham Shoal and the Dudgeon offshore wind farms after the projects were confirmed by the UK Energy Minister as a ‘Pathfinder’ project.

Related Article

Equinor Advances UK Offshore Wind Farm Extension Projects

‘Pathfinder’ projects are identified as projects that have the potential to deliver benefits on better coordinated offshore transmission systems in the near-term and provide important learnings for the other parts of the OTNR process.

Both offshore wind farms are being developed after being selected by the Crown Estate in 2018 to progress to the award of rights together with several other extension projects.

The projects will double the capacity of the existing Sheringham Shoal and Dudgeon offshore wind farms to around 1.4 GW in total, providing renewable energy to power an additional 785,000 UK homes.

Follow offshoreWIND.biz on:

Related Articles

R&D

Seacat Services Takes Delivery of Next-Gen Crew Transfer Vessel

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

21 days ago