offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Offshore and Nearshore Survey Work Complete for 2 GW Scottish Wind Project
R&D

October 31, 2022 · about 3 years ago

Offshore and Nearshore Survey Work Complete for 2 GW Scottish Wind Project

The developers of the West of Orkney Windfarm have completed its 2022 offshore and nearshore surveys for the project area, located around 25 kilometres off the Sutherland coast in Scotland. This milestone achievement covered geophysical and benthic surveys of the seabed across the 675 km2 offshore o

2 minutes read
  • LinkedIn
  • X
  • Email
West of Orkney

The developers of the West of Orkney Windfarm have completed its 2022 offshore and nearshore surveys for the project area, located around 25 kilometres off the Sutherland coast in Scotland.

This milestone achievement covered geophysical and benthic surveys of the seabed across the 675 km 2 offshore option agreement area, with the objective of establishing the project ground model and habitats map.

In addition, nearshore geophysical and geotechnical surveys were completed along the offshore cable corridors.

“We are delighted the seabed survey work has been completed safely, on schedule and within budget, with no lost time incidents. This leaves the project ideally placed to advance our windfarm design and progress with our consent applications next year as planned,” said Stephen Kerr, Project Director of the West of Orkney Windfarm.

The geotechnical campaign included 50 cone penetration tests and 50 vibrocores along the cable route. The nearshore survey vessels covered over 500 kilometres in total, Kerr said.

The offshore seabed surveys commenced in early April 2022, with seabed survey specialists Ocean Infinity using their vessels MV Relume and MV Geo-Ranger , operating out of Scrabster Harbour.

Ocean Infinity was also responsible for the shallow geotechnical work on the cable corridor while the nearshore geophysical survey was completed by Spectrum using the vessels Spectrum 1 and Spectrum Nyquist and a photogrammetry aerial drone.

The bird and marine mammal surveys, which were completed in September, were carried out by HiDef Aerial Surveying using high-resolution digital cameras mounted on aircraft.

According to West of Orkney Windfarm, the information collected keeps the project team on track to submit onshore and offshore consent applications next summer.

The 2 GW project is a joint venture comprising Corio Generation, TotalEnergies, and Renewable Infrastructure Development Group (RIDG).

In January, the consortium secured rights in the Crown Estate Scotland’s ScotWind leasing round to develop the wind farm offshore Scotland.

Both fixed-bottom foundations and floating substructures are being considered and the developers expect the wind farm to begin producing renewable power by 2030.

Related Article

Fixed, Floating, or Both? Major Offshore Wind Project Weighing Options

Follow offshoreWIND.biz on:

Related Articles

Authorities

Scotland Awards 25 GW in ScotWind Auction, More than Half for Floating Wind Farms

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago