offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Hywind Tampen Control Room Officially Opened in Bergen
Operations & Maintenance

November 18, 2022 · about 3 years ago

Hywind Tampen Control Room Officially Opened in Bergen

The onshore control room for the world’s largest floating wind farm, and the first to power oil & gas platforms, has been officially opened in Bergen, Norway. This is the first offshore wind control room in Norway, according to Ole Arild Larsen, Manager Operations Hywind Tampen at Equinor. The 94.6

2 minutes read
  • LinkedIn
  • X
  • Email
Thor Wind Turbine
Thor Wind Turbine

The onshore control room for the world’s largest floating wind farm, and the first to power oil & gas platforms, has been officially opened in Bergen, Norway.

This is the first offshore wind control room in Norway, according to Ole Arild Larsen, Manager Operations Hywind Tampen at Equinor.

The 94.6 MW Hywind Tampen, which produced first power a few days ago, will power the five Snorre and Gullfaks oil and gas platforms on the Norwegian Outer Continental Shelf (OCS), operated by Equinor and partners.

The power from the first turbine, which was installed in June, was delivered to the Gullfaks A platform in the North Sea on 13 November.

The Hywind Tampen control room is co-located with the control room for Valemon, Equinor’s unmanned platform with separation facilities for gas, condensate and water.

In December 2019, Equinor awarded Wood with a contract for topside modifications necessary for the Snorre A and Gullfaks A platforms to integrate the Hywind Tampen with existing systems powering the facilities.

Wood’s scope of work also included equipment installation on the floating wind turbines and upgrades to the onshore control room in Bergen.

In 2020, Lloyd’s Register was contracted for Human-Machine Interface (HMI) engineering services for the control room from which the Hywind Tampen floating wind farm will be remotely operated, as part of the integrated scope Equinor awarded to Wood.

At the Hywind Tampen offshore site, seven of the total of eleven Siemens Gamesa 8.6 MW wind turbines are scheduled to come on stream during the year. The last four turbines were assembled this autumn and will be installed on the field during a weather window next year.

The floating offshore wind farm was initially scheduled to be completed by the end of 2022, but due to some deviations found in steel quality in four tower sections and supply chain bottlenecks, the completion of the wind farm has been postponed to 2023.

Related Articles

Wind Farm Update

First Power Flows from World’s Largest Floating Offshore Wind Farm

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago