offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›IberBlue Unveils First Floating Wind Project, Plans 990 MW Offshore Andalusia
Business & Finance

November 21, 2022 · about 3 years ago

IberBlue Unveils First Floating Wind Project, Plans 990 MW Offshore Andalusia

IberBlue Wind, a joint venture recently established by Ireland-based floating wind developer Simply Blue Group and Spanish companies Proes Consultores and FF New Energy Ventures, announced it will develop the first of its floating wind projects in Spain, offshore Andalusia. The wind farm, named Nao

2 minutes read
  • LinkedIn
  • X
  • Email
IberBlue Unveils First Floating Wind Project, Plans 990 MW Offshore Andalusia

IberBlue Wind, a joint venture recently established by Ireland-based floating wind developer Simply Blue Group and Spanish companies Proes Consultores and FF New Energy Ventures, announced it will develop the first of its floating wind projects in Spain, offshore Andalusia.

The wind farm, named Nao Victoria, is planned to be built off the coasts of Cadiz and Malaga, in the Alboran Sea, the westernmost part of the Mediterranean Sea. There, IberBlue plans to install 55 floating wind turbines that will make up an installed capacity of 990 MW.

The joint venture said it had already sent the Initial Project Document (IPD), which includes its technical characteristics, to the Ministry for Ecological Transition and the Demographic Challenge (MITECO) and initiated contacts with regional and local institutions, and other stakeholders.

The implementation of the offshore wind farm, which is proposed to be located 25-40 kilometres from the coast, will require close collaboration with the nearby ports of Cadiz and Malaga and will play an important role in employment generation, as it will allow the creation of thousands of jobs, according to IberBlue. The majority of these jobs would be created through the development and construction phase, and the rest through the operation and maintenance during the wind farm’s operational lifetime.

“Andalusia is an area with great potential for development of floating offshore wind energy and with this wind project we want to contribute to the region’s positioning on the offshore wind sector” , said Adrián de Andrés , IberBlue Wind vice president.

IberBlue Wind says that its commitment to Andalusia will make a significant contribution to boosting the region’s economic model and that, together with Galicia, the region is one of the strategic development objectives of the joint venture.

IberBlue Wind was launched in September, when the newly created joint venture said it aimed to develop 2 GW of floating offshore wind capacity in Spain and Portugal.

The joint venture is expected to compete in the upcoming auctions in Spain and Portugal , both of which plan to hold their first offshore wind tenders next year.

Related Articles

Business & Finance

New Floating Wind Joint Venture Launched on Iberian Peninsula

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago