offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›EGS Wraps Up Offshore Survey at Skipjack Wind
Grid Connection

December 23, 2022 · about 3 years ago

EGS Wraps Up Offshore Survey at Skipjack Wind

EGS has completed an offshore geophysical and hydrographic survey for Ørsted’s Skipjack Wind offshore wind project off the coast of Maryland’s Delmarva Peninsula, USA. EGS was contracted by Ørsted to conduct, process, and interpret high-resolution geophysical and hydrographic survey data of the near

1 minutes read
  • LinkedIn
  • X
  • Email
EGS Wraps Up Offshore Survey at Skipjack Wind

EGS has completed an offshore geophysical and hydrographic survey for Ørsted’s Skipjack Wind offshore wind project off the coast of Maryland’s Delmarva Peninsula, USA.

EGS was contracted by Ørsted to conduct, process, and interpret high-resolution geophysical and hydrographic survey data of the nearshore sections of the export cable routes for Skipjack Wind, currently in development. The offshore wind farm is located off the coast of Maryland and Delaware.

The survey lasted over a year and involved deploying a wide range of hydrographic and high-resolution geophysical survey instruments from multiple survey vessels throughout New Jersey, Delaware, and Maryland in challenging and remote environments, EGS said.

Over 2,500 kilometres of survey lines were acquired combining nearly 50,000 total man-hours by multiple survey vessels including MV Time and Tide during survey operations. Offshore operations included shallow water high-resolution geophysical and hydrographic surveys.

Located 19 miles (approximately 30 kilometres) off the Maryland-Delaware coast, Skipjack Wind is a 966 MW project comprising the 120 MW Skipjack Wind 1 and the 846 MW Skipjack Wind 2.

Related Article

Two US States Greenlight Four New Offshore Wind Farms

Ørsted will build Skipjack Wind 1 and 2 as one project, with operations expected to begin in 2026.

Follow offshoreWIND.biz on:

Related Articles

Wind Farm Update

UPDATED: Ørsted Investigating Cable Routes, Landfall Sites for Skipjack Export Line

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago