offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›SeaMar to Stand Guard over Hollandse Kust Noord Offshore Wind Farm
Contracts & Tenders

December 27, 2022 · about 3 years ago

SeaMar to Stand Guard over Hollandse Kust Noord Offshore Wind Farm

SeaMar has been contracted by Van Oord to deploy guard vessels on the 759 MW Hollandse Kust Noord (HKN) offshore wind farm in the Netherlands. The guard vessels are present within the 125 km2 total surface area of the wind farm and are keeping close contact with the coast guard and project teams to

1 minutes read
  • LinkedIn
  • X
  • Email
TenneT Awards Contract for Hollandse Kust Noord Onshore Site Prep Work

SeaMar has been contracted by Van Oord to deploy guard vessels on the 759 MW Hollandse Kust Noord (HKN) offshore wind farm in the Netherlands.

The guard vessels are present within the 125 km2 total surface area of the wind farm and are keeping close contact with the coast guard and project teams to secure the construction site.

If required, the guard vessels shall assist the emergency response teams and take an active part in any required emergency situation.

HKN is being developed subsidy-free by the CrossWind consortium, a joint venture between Shell and Eneco, which selected Van Oord as the Balance of Plant (BoP) contractor in 2020.

Located 18.5 kilometres off the Dutch coast, near the town of Egmond aan Zee, the 759 MW offshore wind project will consist of 69 Siemens Gamesa SG 11.0-200 DD wind turbines.

The installation and commissioning of the wind farm is expected to be completed in the second half of 2023.

Related Article

Construction Starts on CrossWind’s Hollandse Kust Noord Offshore Wind Farm

The project’s owner CrossWind will be implementing several innovations in the construction of the wind farm, such as offshore hydrogen production and floating solar panels .

Follow offshoreWIND.biz on:

Related Articles

Contracts & Tenders

Van Oord to Build Hollandse Kust (Noord)

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago