offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Foundations Needed for German Offshore Wind Project
Contracts & Tenders

January 10, 2023 · about 3 years ago

Foundations Needed for German Offshore Wind Project

Vattenfall has issued a contract notice seeking the manufacturer of monopile foundations for the N-7.2 offshore wind project in the German North Sea. The contract is divided into two lots, with Lot 1 covering the manufacturing of between 49 and 68 monopiles, and Lot 2 covering the production of the

1 minutes read
  • LinkedIn
  • X
  • Email
OWC

Vattenfall has issued a contract notice seeking the manufacturer of monopile foundations for the N-7.2 offshore wind project in the German North Sea.

The contract is divided into two lots, with Lot 1 covering the manufacturing of between 49 and 68 monopiles, and Lot 2 covering the production of the same number of transition pieces.

The tender remains open until 10 February.

Back in September 2022, Vattenfall exercised the step-in right to develop an offshore wind farm at the N-7.2 zone.

Following a final investment decision by Vattenfall, the offshore wind farm could be connected to the German electricity grid sometime in 2027 and when fully developed, would have an output of 980 MW.

Located 85 kilometres off the island of Borkum, the N-7.2 project was originally developed under the name Global Tech II by a consortium led by Strabag SE.

Vattenfall acquired the project in 2016, but when a new offshore wind tendering system was put in place, the area was auctioned again.

Vattenfall held the step-in rights for the zone through Vattenfall Atlantis 1 and Global Tech 2 Offshore Wind GmbH. The step-in rights were awarded to companies whose projects had not made it through the second transitional tenders in previous auctions.

Follow offshoreWIND.biz on:

Related Articles

Business & Finance

Vattenfall Steps In Offshore Germany, Matches Zero-Subsidy Bid

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago