offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Acta Marine CSOVs Fleet Starts Taking Shape
Contracts & Tenders

January 19, 2023 · about 3 years ago

Acta Marine CSOVs Fleet Starts Taking Shape

The steel-cutting ceremony has kicked off for the construction of the first of two next-generation construction service operating vessels (CSOVs) for Acta Marine at Tersan Shipyard in Türkiye. The 89-metre-long vessels will be equipped with an SMST-provided motion-compensated crane and a motion-comp

1 minutes read
  • LinkedIn
  • X
  • Email
Acta Marine

The steel-cutting ceremony has kicked off for the construction of the first of two next-generation construction service operating vessels (CSOVs) for Acta Marine at Tersan Shipyard in Türkiye.

The 89-metre-long vessels will be equipped with an SMST-provided motion-compensated crane and a motion-compensated gangway for safe personnel transfer in wave heights up to 3 metres.

The CSOVs measure 89 metres in length, 19 metres in width and, can accommodate up to 135 people in 85 cabins.

In addition to the Methanol MDO/HVO engines, the DP2 CSOVs will feature a battery power storage system that should create further energy efficiency and CO2 reduction.

The vessels are primarily aimed at the offshore wind construction market and carry the new SX-216 TWIN X-STERN design from Ulstein Design & Solutions AS that was exclusively designed for and in cooperation with Acta Marine.

The combination of thrusters and symmetrical hull design results in lower energy consumption and reduced motion, and therefore, higher operability and comfort, Acta Marine said.

In June last year, Acta Marine signed a contract with Tersan Shipyard for the construction of two next-generation Methanol MDO/HVO-powered CSOVs.

The first two boats are scheduled for delivery in the second and third quarter of 2024. The company also reserved options for two additional CSOVs for delivery at a later stage.

Follow offshoreWIND.biz on:

Related Articles

Contracts & Tenders

Acta Marine Orders Methanol-Powered CSOVs

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

21 days ago