Half of the US offshore wind energy projects in the pipeline are at risk of being delayed beyond 2030 because of limited port and vessel infrastructure and domestic manufacturing, according to a new report co-authored by the National Renewable Energy Laboratory (NREL) and the Business Network for Offshore Wind.
The US has set the target of reaching 30 GW of operating offshore wind capacity by 2030. Currently, the country has 42 MW of offshore wind capacity in operation.

