offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›World’s First Offshore Vessel Charging System Completes Harbour Trials
R&D

March 15, 2023 · about 3 years ago

World’s First Offshore Vessel Charging System Completes Harbour Trials

MJR Power and Automation, together with Blackfish Engineering and Tidal Transit, have completed the harbour trials of the company’s platform-mounted automated offshore power and charging system. The harbor trials were carried out at the Port of Blyth in the UK using the Crew Transfer Vessel (CTV) Ti

2 minutes read
  • LinkedIn
  • X
  • Email
MJR Power and Automation Harbour Trials

MJR Power and Automation, together with Blackfish Engineering and Tidal Transit, have completed the harbour trials of the company’s platform-mounted automated offshore power and charging system.

The harbor trials were carried out at the Port of Blyth in the UK using the Crew Transfer Vessel (CTV) Tia Elizabeth , owned and operated by Tidal Transit.

The set-up at the port replicated the installation of the offshore power and charging system on an offshore wind and/or substation validating the safe connection, mooring, and charging of the battery bank installed on the CTV.

All interconnection, mooring, automation, monitoring, and safety systems, including wireless communication and emergency disconnection, were tested and validated during the harbour trails.

With harbour trials completed, MJR will demobilise the equipment and prepare for installation on a substation in an offshore wind farm in the North Sea.

Designed to convert energy delivered directly from an offshore wind farm, the power and charging system could enable all heavy hybrid and electric CTVs and other offshore support vessels to connect in the field to a 100 per cent green energy source.

“By providing a solution to power vessels and charge batteries in the field – primarily during periods when they would otherwise be idle – MJR’s offshore power and charging system will prove to be a key enabler for the large-scale deployment of eCTVs and larger electric hybrid vessels across the offshore sector”, said Paul Cairns , Managing Director at MJR.

“Put simply, if 50% of the UK’s CTV fleet converted to electric operation, this would eliminate approximately 131,100 tonnes of CO2 each year.”

According to the UK’s Department for Transport, the world’s first offshore charging points for electric vehicles were planned to be installed on the Lynn and Inner Dowsing wind farms last summer.

In addition to charging CTVs, with a maximum charging time of two hours, MJR is also developing a similar system delivering higher powers for larger vessels, including Service Operations Vessels (SOVs) and Platform Supply Vessels (PSVs).

Related Article

World’s First Offshore Vessel Charging Project Expands to SOVs and PSVs

Follow offshoreWIND.biz on:

Related Articles

R&D

Five UK Projects Looking to Decarbonise Maritime Sector with Offshore Wind

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnologyVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago