offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Keel Laid for Second Olympic Subsea CSOV in Poland
Operations & Maintenance

March 16, 2023 · about 3 years ago

Keel Laid for Second Olympic Subsea CSOV in Poland

Ulstein has held a keel-laying ceremony for the second of the two Construction Service Operation Vessels (CSOV) ordered by Olympic Subsea ASA at the Crist yard in Poland. The keel for Olympic Subsea’s first CSOV was laid on 31 January. The two vessels are designed for the offshore wind industry and

2 minutes read
  • LinkedIn
  • X
  • Email
Keel Laid for Second Olympic Subsea CSOV in Poland

Ulstein has held a keel-laying ceremony for the second of the two Construction Service Operation Vessels (CSOV) ordered by Olympic Subsea ASA at the Crist yard in Poland.

The keel for Olympic Subsea’s first CSOV was laid on 31 January.

The two vessels are designed for the offshore wind industry and are based on the newly developed TWIN X-STERN hull design from Ulstein Design & Solutions AS.

The TWIN X-STERN, with main propellers fore and aft, reduces the energy consumption to a new level when positioned at the wind turbines, Ulstein said.

While the two vessels are being constructed at the hull yard, the project management, planning and follow-up, purchasing, and engineering works are underway at Ulstein.

The first hull is expected to arrive at Ulstein Verft in Norway in the fourth quarter of this year for final outfitting.

Related Article

First Steel Cut for Second Olympic CSOV Newbuild

The CSOVs are based on the ULSTEIN SX222 design. They have hybrid battery propulsion and are prepared for methanol fuel to enable zero-emission operations.

The vessels will have a length of 89.6 metres, a beam of 19.2 metres, and will be capable to accommodate 126 people in 91 cabins.

”As a shipowner in the Norwegian maritime cluster, it has been important for us to invest in the Norwegian maritime cluster,” CEO of Olympic Group, Stig Remøy , said.

”With a Norwegian shipyard, ship designers, equipment suppliers and Vartdal Invest as a co-investor, this is a project with strong local ownership. For us, it will be crucial that the vessels are delivered on time and at the right quality, and this is what Ulstein Verft is known for.”

Follow offshoreWIND.biz on:

Related Articles

Business & Finance

Olympic Orders Two CSOVs from Ulstein, Signs Options for Two More

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago