The first steel has been cut for the second Construction Service Operations Vessel (CSOV) NB1121 ordered by Acta Marine at Tersan Shipyard in Türkiye .
Tersan Shipyard is building two DP2 CSOVs powered with methanol and MDO/HVO. The Dutch vessel owner signed a contract with the shipyard in June 2022.

