Meanwhile, Vattenfall and Fred. Olsen Seawind are now also collecting wind resource and oceanographic and meteorological data for the project, after recently deploying a floating LiDAR.
The metocean campaign will run for a minimum period of twelve months to inform the project’s engineering works, with instrumentation distributed across two separate mooring systems.
