A total of 106 turbine foundations are to be installed on the Godewind 3 and Borkum Riffgrund 3 offshore wind farms.
The vessel features a main crane of 5,000 tonnes, a deck loading capacity of 61,000 tonnes, and a deck space of 9,300 square metres, which should enable it to easily transport several heavier future foundations in one trip.
