offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Correll Group Strikes Again in Taiwan
Contracts & Tenders

August 21, 2023 · about 2 years ago

Correll Group Strikes Again in Taiwan

The Correll Group, Electrical Engineering Division has been contracted by Seaway 7 to complete the termination and testing of inter-array cables (IAC) and export cables on the 298 MW Zhong Neng offshore wind farm in Taiwan. Under the contract, the Correll Group will be responsible for the terminatio

2 minutes read
  • LinkedIn
  • X
  • Email
Correll Services Strikes Again in Taiwan

The Correll Group, Electrical Engineering Division has been contracted by Seaway 7 to complete the termination and testing of inter-array cables (IAC) and export cables on the 298 MW Zhong Neng offshore wind farm in Taiwan.

Under the contract, the Correll Group will be responsible for the termination and testing of 29 66 kV inter-array cables and four landfall export cables on the Zhong Neng offshore wind farm, located some 13 kilometres off Changhua County on the west coast of Taiwan.

The project will be split into two campaigns, said the Correll Group. The first phase, which already started in July, involves the splicing and testing of the export fibre optic cables at the onshore Transition Joint Bay.

The second phase is expected to commence in the second quarter of 2024 and consists of the termination and testing activities for the high-voltage power cores and fibre optic cables within the export and IAC subsea cables.

In August last year, the Correll Group signed a contract with Seaway Offshore Cables for the termination and testing of cables for the Changfang & Xidao offshore wind farms, which are adjacent to the Zhong Neng project.

The offshore construction on the Zhong Neng wind farm started in March with the installation of pin piles for the jacket foundations, for which CDWE deployed DEME’s installation vessel Apollo .

The first jacket was placed on the seabed last week by Green Jade , the first Taiwan-built offshore wind installation vessel, operated by CSBC-DEME Wind Engineering (CDWE).

The Zhong Neng offshore wind farm, being developed by a joint venture between Copenhagen Infrastructure Partners (CIP) and China Steel Corporation (CSC), will comprise 31 Vestas V174-9.6 MW turbines, all of which are scheduled to be in operation in 2024.

Follow offshoreWIND.biz on:

Related Articles

Vessels

First Jacket Foundation In at Zhong Neng Offshore Wind Farm

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

28 days ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

28 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

28 days ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

28 days ago