offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›DEME Offshore Contracts Hellenic Cables for Dieppe Le Tréport Inter-Array Links
Business & Finance

September 1, 2023 · about 2 years ago

DEME Offshore Contracts Hellenic Cables for Dieppe Le Tréport Inter-Array Links

Hellenic Cables has signed a contract with DEME Offshore for the supply of inter-array cables for the Dieppe Le Tréport offshore wind farm in France, being developed by the Eoliennes en mer Dieppe Le Tréport (EMDT) consortium off the French coast in the English Channel. Under the contract, the Greec

1 minutes read
  • LinkedIn
  • X
  • Email
A map showing Dieppe Le Treport offshore wind farm location

Hellenic Cables will begin with manufacturing operations for Dieppe Le Tréport in 2025 at its factory in Corinth, Greece, from where the cables are expected to be sent off to France in the second half of the same year.

The cable manufacturer’s contract follows the final investment decision (FID) that the Eoliennes en Mer Dieppe Le Tréport (EMDT) consortium, comprising Ocean Winds, Sumimoto Corporation, and Banque des Territoires, made in April this year and the EUR 300+ million of contracts DEME signed with EMDT shortly after.

Related Article

DEME Inks EUR 300+ Million Deal for Dieppe Le Tréport Wind Farm Offshore France

DEME’s contracts include the transport and installation of the pin piles and jacket foundations for the wind turbines; the transport and installation of the pin piles, the jacket, and the topside for the offshore substation; and an EPCI contract for the inter-array cables.

The 496 MW Dieppe Le Tréport offshore wind farm, set to be built at a site located 15 kilometres off the city of Le Tréport and 17 kilometres off the city of Dieppe, will have 62 Siemens Gamesa 8 MW wind turbines, all of which are scheduled to go into operation in 2026.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago