Each rotation of the 107-metre long blades on the project’s first operational turbine can produce enough clean energy to power an average British home for two days, said SSE Renewables.
The first two phases, Dogger Bank A and Dogger Bank B, will comprise 95 Haliade-X 13 MW turbines each, while Dogger Bank C will feature 87 Haliade-X 14 MW turbines .
