The vessel has a diesel-electric propulsion system, bolstered by a battery hybrid power management and architecture, and incorporates the Voith eVSP propulsion and a drop-down azimuth thruster for field efficiency.
The SOV also features a SeaQ power package delivered by Vard Electro, providing control over the onboard power systems. This integration reduces fuel consumption, minimises emissions, improves responsiveness, and enhances safety, according to Vard.
“I’m extremely proud having overseen the successful build and delivery of the Grampian Derwent on route from North Star’s home harbour of Aberdeen to the Dogger Bank Wind Farm and the Port of Tyne. This is the second offshore wind support vessel to be delivered to the site, with more still to come!” said Michael Reid , SOV new build lead.
YOU MIGHT ALSO LIKE
The Dogger Bank offshore wind farm is being built in three 1.2 GW phases, named Dogger Bank A, B & C, and will be able to power the equivalent of six million UK homes on completion.
Dogger Bank Wind Farm is a joint venture between SSE Renewables (40 per cent), Equinor (40 per cent) and Vårgrønn (20 per cent). SSE Renewables is the lead operator for the development and construction of Dogger Bank Wind Farm. Equinor will be the lead operator of the wind farm on completion for its expected operational life of around 35 years.
Follow offshoreWIND.biz on:
