The 69th and final Siemens Gamesa SG 11.0-200 DD wind turbine was installed at the 759 MW Hollandse Kust Noord wind farm in the Dutch North Sea on Thursday, 19 October, CrossWind, the owner and developer of the wind farm said.
The final turbine’s three 97-metre long blades were lifted into position on Thursday evening, at around 11:00 PM.
