offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business development›Metocean Campaign Starts at Floating Wind Farm Site Offshore Scotland
Business development

November 21, 2023 · about 2 years ago

Metocean Campaign Starts at Floating Wind Farm Site Offshore Scotland

Salamander, a joint venture between Ørsted, Simply Blue Group, and Subsea7, has launched floating LiDAR and wave buoys as part of the metocean campaign for the proposed floating offshore wind project off the northeast of Scotland. The survey, conducted by Fugro, will run for twelve months and produc

1 minutes read
  • LinkedIn
  • X
  • Email
Salamander metocean campaign

Salamander, a joint venture between Ørsted, Simply Blue Group, and Subsea7, has launched floating LiDAR and wave buoys as part of the metocean campaign for the proposed floating offshore wind project off the northeast of Scotland.

The survey, conducted by Fugro, will run for twelve months and produce insights that will inform the project’s design, operations, and maintenance strategy, as well as support the planning application process, according to Salamander.

Two floating SEAWATCH Wind Lidar Buoys and a Wavescan buoy have been deployed to gather meteorological, oceanographic, and environmental site data. These include wave height, wind, and current speed, and other region-specific metrics.

The metocean survey forms part of a series of surveys to be conducted by Salamander before starting the Environmental Impact Assessment (EIA) and Habitat Regulations Appraisal (HRA).

The project team aims to submit the necessary consent applications by early 2024.

YOU MIGHT ALSO LIKE

The 100 MW floating wind farm is one of the 13 projects selected in Scotland’s Innovation and Targeted Oil and Gas (INTOG) leasing round and one of the five INTOG innovation projects that signed exclusivity agreements with Crown Estate Scotland in May.

The Salamander floating offshore wind farm will be located 35 kilometres off the coast of Peterhead in northeast Scotland and is planned to deploy innovative floating offshore wind technologies to support the cost reduction and learning journey needed for the commercial deployment of floating offshore wind.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business developmentProject UpdatesResearch & DevelopmentWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

13 days ago