offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›ABL Wins Work on Belgian Energy Island
Contracts & Tenders

November 30, 2023 · about 2 years ago

ABL Wins Work on Belgian Energy Island

Energy and marine consultancy ABL has been awarded a contract to provide marine warranty survey (MWS) services for the offshore transportation and installation (T&I) operations relating to the Modular Offshore Grid 2 (MOG2) energy island project in the Belgian sector of the North Sea. ABL’s scope of

2 minutes read
  • LinkedIn
  • X
  • Email
ABL MOG2 project

Share this article

Energy and marine consultancy ABL has been awarded a contract to provide marine warranty survey (MWS) services for the offshore transportation and installation (T&I) operations relating to the Modular Offshore Grid 2 (MOG2) energy island project in the Belgian sector of the North Sea.

ABL’s scope of work includes the review of all procedural documentation, vessel inspections to assess the suitability of the proposed fleet for T&I operations, and on-site attendance to assure operational compliance with the approved procedures.

It will cover the T&I for the energy island (a concrete caisson foundation and port), HVAC and HVDC modules, and export cables.

The contract has been awarded by Elia Group, the Belgium electric services company.

The MOG2 project aims to develop offshore grid infrastructure to connect new wind farms in the 3.5 GW Princess Elisabeth zone to the Belgian national grid via an energy hub located on an artificial island.

YOU MIGHT ALSO LIKE

The project’s purpose is to create an energy hub in the form of an artificial island, not only to provide a means of connecting new Belgian offshore power to the mainland but also to make optimal use of the power production areas in other parts of the North Sea by accommodating a connection point for hybrid interconnections.

If built to full capacity, the Princess Elisabeth wind farm zone will raise Belgium’s installed offshore wind capacity from the current 2.26 GW to 5.8 GW by 2030.

Belgium is also one of the four EU countries that announced the common aim of increasing the joint offshore wind capacity to 65 GW by 2030, and 150 GW by 2050.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersSupply Chain

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago