The Agnes Romagna Hub consists of two offshore wind farms, Romagna 1 and Romagna 2, with a total capacity of 600 MW.
Romagna 1 is proposed to be built 22 kilometres off the coast of Lido di Classe, spanning an area of 85 square kilometres, where 25 wind turbines with 8 MW of capacity each would be installed. The floating photovoltaic system with a power of 100 MWp would be installed next to the Romagna 1 wind farm.
