offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Fixed-Bottom›All Turbines Installed at French Fécamp Offshore Wind Farm
Fixed-Bottom

March 26, 2024 · about 2 years ago

All Turbines Installed at French Fécamp Offshore Wind Farm

The 71st and final wind turbine was installed on 25 March at the Fécamp offshore wind farm in France, the first project of this kind to be built in Normandy. According to EDF Renouvelables, the last wind turbines that were installed are expected to produce electricity in the coming weeks, after test

1 minutes read
  • LinkedIn
  • X
  • Email
All Turbines Installed at French Fécamp Offshore Wind Farm

All wind turbines are standing on gravity-based foundations supplied and installed by a consortium of Boskalis, Saipem, and Bouygues Construction.

Fécamp is the third commercial-scale offshore wind project in France to be completed, following Saint-Nazaire and Saint-Brieuc offshore wind farms.

Once fully commissioned, the 500 MW offshore wind farm will produce enough electricity to meet the annual electricity consumption of 770,000 people, equivalent to 60 per cent of the population of Seine-Maritime.

The project is owned by Eolien Maritime France (EMF), a joint venture between the French company EDF Renouvelables; EIH S.à.rl, owned by Enbridge Inc. and CPP Investments; and Skyborn Renewables (formerly wpd offshore).

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Fixed-BottomProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago