The installation of inter-array cables (IAC) is also ongoing at Dogger Bank A with the cable-laying vessel (CLV) Viking Neptun laying the cables, the walk-to-work (W2W) vessel Esvagt Froude supporting the cable pull-in operations, and the multipurpose vessel Living Stone carrying out cable burial work.
The IAC work will continue over different campaigns until 30 June 2024.
