Dong Fang Offshore, a subsidiary of Hung Hua Construction, purchased Polar Onyx from GC Rieber Shipping in 2021 and said that the vessel would be converted into a cable-laying vessel, with the conversion expected to be completed by the end of 2023.
Seaway7 is in charge of the supply and installation of the export and inter-array grid cable systems at the 640 MW Yunlin wind farm under a contract signed in 2018.
