offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›German Steel Manufacturers Sign PPA with EnBW for He Dreiht Offshore Wind Farm
Business & Finance

April 12, 2024 · about 2 years ago

German Steel Manufacturers Sign PPA with EnBW for He Dreiht Offshore Wind Farm

EnBW and SHS – Stahl-Holding-Saar have signed a 15-year power purchase agreement (PPA) for 50 MW of generation capacity from the 960 MW He Dreiht offshore wind farm in Germany. SHS plans to use the green electricity produced by He Dreiht to power operations at the two major steel companies in the Ge

1 minutes read
  • LinkedIn
  • X
  • Email
Monopiles for the He Dreiht offshore wind farm

With the He Dreiht offshore wind farm, SHS already has a connection through Dillinger, whose subsidiary Steelwind Nordenham will supply the project’s 64 monopiles.

The monopiles – each measuring 70 metres in length, 9.2 metres in diameter and up to 1,300 tonnes in weight – are being made using plates from Steelwind’s parent company Dillinger.

“The cooperation with EnBW is a real win-win situation. We supply the steel for the wind farm, while the electricity generated here from renewable sources in turn helps us to drive the transformation process for our companies Saarstahl and Dillinger. Our steel production operation is still based on classic blast furnace technology. From 2030, we want to generate fewer emissions when manufacturing 3.5 million metric tons – about 70 percent – of our steel,” said Stefan Rauber , Chairman of the Board of Management of SHS and Chairman of Dillinger and Saarstahl.

Related Article

Steelwind Nordenham to Deliver Monopiles for 15 MW Offshore Wind Turbines

Located approximately 85 kilometres northwest of the Island of Borkum and about 110 kilometres west of Heligoland, He Dreiht will comprise a total of 64 Vestas 15 MW turbines .

The offshore wind farm is expected to go into operation in 2025.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceFixed-BottomProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago