On 16 April, the Netherlands-based TWD (Temporary Works Design) informed that the company was responsible for designing most of the pin pile installation equipment on the heavy lift vessel.
This includes the design of a subsea self-levelling pre-piling template which is currently the largest and most complex of its kind in the industry, according to TWD.
