offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Fixed-Bottom›First Turbines Up at 476 MW Baltic Eagle Offshore Wind Farm
Fixed-Bottom

May 7, 2024 · about 2 years ago

First Turbines Up at 476 MW Baltic Eagle Offshore Wind Farm

First Vestas V174-9.5 MW turbines have been installed by Fred. Olsen Windcarrier’s jack-up vessel Blue Tern at the Baltic Eagle offshore wind farm in Germany. According to the AIS data available online, the vessel Blue Tern is currently in the Port of Rønne, Denmark, for the next loadout of wind tur

1 minutes read
  • LinkedIn
  • X
  • Email
Baltic Eagle first turbine

In 2021, Vestas finalised the wind turbine supply contract for Baltic Eagle with Iberdrola, one of the developers of the project.

That same year, Fred. Olsen Windcarrier signed a contract with the Danish turbine manufacturer for the transportation and installation of 50 9.5 MW wind turbines at the offshore wind farm, located in the German Baltic Sea, northeast of the Rügen island off the Pomeranian coast.

The 476 MW Baltic Eagle will be linked to the German high-voltage grid via the Ostwind 2 grid connection.

Scheduled to be commissioned by the end of 2024, the project will supply approximately 475,000 households with renewable energy while reducing CO2 emissions by approximately 800,000 tonnes per year.

Baltic Eagle is a joint venture between Abu Dhabi-based Masdar and Iberdrola.

This content is available after accepting the cookies.

Source: Iberdrola Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Fixed-BottomProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago