The company will mobilise the DP2 heavy lift crane vessel Fairplayer , outfitted with an underwater abrasive cutting and lifting tool supplied by Claxton Engineering Services, as well as an ROV.
The monopiles will be removed in several sections to approximately 3 metres below mean seabed level. The sections will then be lifted into the vessel’s 1,400-square-metre cargo hold for transportation to a local Taiwanese port, where Fairplayer will offload them to the quayside.
