When it comes to offshore wind, the plan allows for over 4.7 GW of new offshore wind capacity with 3.1 GW in the Central Coast (Morro Bay call area) and 1.6 GW in the North Coast area ( Humboldt call area).
California initially planned to install 3 GW of offshore wind by 2030, 15 GW by 2045, and 20 GW by 2050.
However, in 2022, the state increased its targets and set a goal of 25 GW of installed offshore wind capacity by 2045.
Related Article
California Adopts 2045 Offshore Wind Target, Plans Installing 25 GW by That Time
Follow offshoreWIND.biz on:
