offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business development›TGS to Launch Wind and Metocean Measurement Campaign Offshore US West Coast
Business development

June 26, 2024 · about 2 years ago

TGS to Launch Wind and Metocean Measurement Campaign Offshore US West Coast

TGS, a global provider of energy data and intelligence, will conduct a new campaign for offshore wind and metocean measurement in Morro Bay, off the US West Coast. The deployment is supported by funding from the offshore wind industry and is expected to be launched in the third quarter of 2024. The

2 minutes read
  • LinkedIn
  • X
  • Email
California Morro Bay TGS

Share this article

TGS, a global provider of energy data and intelligence, will conduct a new campaign for offshore wind and metocean measurement in Morro Bay, off the US West Coast.

The deployment is supported by funding from the offshore wind industry and is expected to be launched in the third quarter of 2024.

The campaign seeks to enhance the understanding of offshore conditions across three wind energy lease areas in Morro Bay. TGS will carry out its campaign at sites where Equinor, Ocean Winds, and Invenergy plan to build their floating offshore wind projects.

The three-year deployment in an area with an average depth of 1,000 metres will be the first by TGS on the West Coast of the US. It will add to its comprehensive library of wind and metocean data collected on the East Coast of the US, Norway, and Germany.

The data gathered will offer insights throughout the floating wind farm development lifecycle, including environmental impact assessments and technical decisions such as turbine selection, layout optimization, foundation design, and operations and maintenance planning.

Additionally, it will enable more accurate modeling of capital expenditures (CAPEX), operational expenditures (OPEX), potential energy production, and grid requirements, said TGS.

Ocean current measurements and tidal information collected over this period will be valuable for grid connection planning, while accurate atmospheric turbulence, according to the company.

YOU MIGHT ALSO LIKE

The buoy, which will be supplied by EOLOS, will be equipped with advanced sensors designed to capture detailed measurements of wind, metocean, and environmental data. Key metrics include wind speed, and direction at turbine hub height, wave heights, ocean current data across the full water column, and monitoring of birds, bats, and fish.

As with all wind and metocean campaigns conducted by TGS, the multi-client approach will allow multiple customers to subscribe to the same floating LiDAR data, which should reduce development costs and timelines.

Similar initiatives have already been deployed on the East Coast of the US, in Germany, and offshore Norway, where fleet-wide LiDAR data availability averages 94 per cent across all TGS deployments at a 140-metre measurement height, said the company.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business developmentFloating WindResearch & Development

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago