Equinor signed a memorandum of understanding with Ulsan City in May 2019 for the development of the floating wind project at an area located some 70 kilometres off the Ulsan coast, spanning two sites, each covering 75 square kilometres.
The Firefly/Bandibuli floating wind farm is planned to have an installed capacity of up to 800 MW and to be in operation in 2027.

