offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›EDF Renewables Opens Offshore Wind Transport & Installation Tender for Work Starting in 2029/2030
Contracts & Tenders

August 16, 2024 · about 1 year ago

EDF Renewables Opens Offshore Wind Transport & Installation Tender for Work Starting in 2029/2030

EDF Renewables has issued a contract notice for offshore wind transport and installation (T&I) services. The France-based energy company intends to award a long-term agreement to a provider having the capability to install foundations and 15+ MW wind turbines, with work starting in 2029 or 2030. The

2 minutes read
  • LinkedIn
  • X
  • Email
EDF Renewables Opens Offshore Wind Transport & Installation Tender for Work Starting in 2029/2030

Share this article

EDF Renewables has issued a contract notice for offshore wind transport and installation (T&I) services. The France-based energy company intends to award a long-term agreement to a provider having the capability to install foundations and 15+ MW wind turbines, with work starting in 2029 or 2030.

The procurement, which opened on 12 August, seeks offshore heavy-lift capacities to transport and install wind turbines and perform additional offshore wind-related work. According to the notice, the offshore wind developer will award a five-year framework agreement with a potential start date between 2029 and 2030. The agreement includes optional engineering, management, and asset operation scope.

In the requirements, EDF lists, among other things, heavy-lift vessel capacity capable of installing wind turbines of 15 MW and more, with applicants required to present their fleets. This includes existing fleet, fleet in construction, under discussion, and vessels subject to a decision of investment expected to arrive on the market before 2032, as well as plans for crane upgrade/leg extension or any major modification that could allow increasing the capacity of installation capabilities.

Interested T&I service providers are also required to prove their experience in wind turbine installation by detailing both past and future work over the 2020-2028 period and involving a jack-up vessel with a crane with a lifting capacity greater than 1,600 tonnes. Other details such as contract key milestones dates, scope of work and split of responsibilities, and description of engineering expertise are also to be provided.

YOU MIGHT ALSO LIKE

In the contract notice, EDF Renewables also list a requirement “for the specific case of US” that involves a brief description of the base case approach to comply with the Jones Act when performing a full wind turbine installation, risk approach philosophy with regards to feedering, transport transfer and installation phases. Here, the developer also requires a view on the split of role and responsibilities and details of the marine spread that could be proposed.

Similar requirements are set for foundation and transition piece installation, including the past and upcoming experience, vessel details, as well as past performance per type of foundation.

According to the tender information, these criteria, as well as other tender requirements, including those regarding economic and financial standing and suitability to pursue the professional activity, will be used to select the candidates who will be invited for the second stage of the procedure.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersSupply ChainVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago