The installation of blades at Dogger Bank was affected by the blade failure on a GE Vernova wind turbine in the US last month and the subsequent investigation and quality control work.
As reported on 25 July, the breakage of the blade on one of GE Vernova’s Haliade-X wind turbines at the Vineyard Wind 1 offshore wind farm in the US was caused by a manufacturing deviation, according to the preliminary investigation.
