Earlier this year, Archer took over Moreld Ocean Wind (MOW) and with it a stake in the floating wind technology developer Ocergy, whose foundation will be installed at the Culzean site.
According to TP-Products which will supply its patented flange connector, this will be the world’s first bolted floating wind structure.
